Skip to main content

Nga Awa Block Maintenance

Maintenance work is taking place on the public toilet and shower facilities of the Nga Awa Block from Monday 13 April until Wednesday 22 April.

During this time, the referee changing rooms will be available for use between the hours of 6:00am and 9:00pm.

Delays on Toe Toe Road Bridge and Moawhango Road Bridge

October 03, 2018

Bridge Delays

On 8 and 9 October 2018 Bridge Inspections will be undertaken on the Toe Toe Bridge and Moawhango Bridge, Te Moehou Road. As part of the inspections a Bridge Inspection Unit (BIU) will be used, occupying the entire lane width. So, when the BIU is on the bridge no traffic will be able to cross.

The inspections will be conducted in 45 minute intervals, letting traffic through approximately 15 minutes per hour.

Therefore, there could be delays of up to 45 minutes at a time between 7.00am and 6.00pm on these two days at these bridges. Of course, emergency services will be given immediate access.

Proposed order of inspections

  • 8 October 2018 Moawhango Bridge
  • 9 October 2018 Toe Toe Bridge